Orleans Conservation Commission
Hearing Meeting Nauset Room June 18, 2013
8:30 a.m. Call to Order
Continuations
Last Heard 5/21/13 (BR1)
Steve Simon 8 & 10 Beach Road
Assessor’s Map 36, Parcel 23 & 24. The proposed installation of a water line. Work will occur within 25’ of the Edge of Wetland.
Notice of Intent
Jonathan S. & Judith A. Chester 124 Namequoit Road
by Ryder & Wilcox, Inc. Assessor’s Map 70, Parcel 11. The proposed construction of a pervious bluestone patio within existing lawn area; removal of invasive species; & restoration with native plantings. Work will occur within 100’ of the Top of a Coastal Bank, Land Subject to Coastal Storm Flowage, & within the Pleasant Bay A.C.E.C.
Mark & Elizabeth Burnett 24 The Lane
by Coastal Engineering Company, Inc. Assessor’s Map 50, Parcel 116. The proposed renovation of an existing dwelling, relocation of an existing septic tank, & landscaping. Work will occur within 100’ of the Top of a Coastal Bank & within the Pleasant Bay A.C.E.C.
Modification/Amend Order of Conditions
Last Heard 6/4/13 (JO1, PM1)
Frank Csongor 47 Nauset Road
The proposed consideration of modification or Amendment to the Order of Conditions SE 54-2147 at 47 Nauset Road, Assessor’s Map 22, Parcel 71.
Revised Plan
Tamara Fouche-Gamache 77 Towhee Lane
by Ryder & Wilcox, Inc. Assessor’s Map 93, Parcel 4. The proposed construction of a patio & the replacement of an existing timber stairway has been revised to include the installation of a Utility Conduit Box. Work will occur within 100’ of the Top of a Coastal Bank, on a Coastal Bank, on Land Subject to Coastal Storm Flowage, & within the Pleasant Bay A.C.E.C.
Certificate of Compliance
Julian T. & Elaine F. Baird (2012) 4 Mayflower Circle
The request for a Certificate of Compliance for an Order of Conditions for the replacement of dug in steps with new dug in steps and an elevated stairway, and the removal of 2 locust trees.
Merwin and Joan Rubin (2003) 14 Brick Hill Road
The request for a Certificate of Compliance for an Order of Conditions for the construction of an 8’x24’ addition to an existing house.
Merwin & Joan Rubin (2005) 14 Brick Hill Road
The request for a Certificate of Compliance for an Order of Conditions for the removal of deteriorated 4” PVC piping, concrete junction box at end of culvert, and installation of a stone splash apron at the end of the culvert. No work took place under this Order.
Administrative Reviews
David Dunford 11 Portside Lane
The proposed construction of a kayak rack.
Chairman’s Business
Approval of the Minutes from the Meeting on May 28, 2013.
Other Member’s Business
Administrator’s Business
Site Visits
The listing of matters are those reasonably anticipated by the Chair which may be discussed at the meeting. Not all items listed may in fact be discussed and other items not listed may also be brought up for discussion to the extent permitted by law.
|